Back

SWIE energy constructs photovoltaic system for C+C Wedl in Saalfelden

19.08.2022

The SWIETELSKY subsidiary installed a system with 250 kilowatts on the new market building in the Salzburg Pinzgau.

Already at the groundbreaking ceremony in May 2021, Lorenz Wedl, managing director of the Wedl trading house, emphasized: "It is important to us that the new building is constructed sustainably and according to the latest energy standards." The 794 individual PV modules, each with 375 watts, were mounted on the roof of the building in an east-west orientation. Two 100-kilowatt and one 50-kilowatt inverters were installed in the main electrical distribution room. They handle the conversion of the generated direct current into alternating current.