Since construction began in autumn 2025, extensive interventions in the existing building fabric as well as the erection of the new structure are being carried out. The execution primarily involves the precise installation of the following core materials and scopes:
· Renovation of existing areas: approx. 3,000 m²
· Structural steel installed: approx. 70 metric tons
· Concrete placed: approx. 800 m³
Project Profile
· Project: Renovation of the District Administrative Authority (Bezirkshauptmannschaft)
· Location: Gänserndorf
· Duration: Since autumn 2025
· Responsibility: Building Construction Vienna Lower Austria Burgenland (Hochbau Wien NÖ Bgld.)
· Scope of Work: Renovation │ Installation of structural steel and concrete
· Key Figures: approx. 3,000 m² existing area │ approx. 70 metric tons structural steel │ 800 m³ concrete