The true centerpiece of the construction project is the installation of new stranded permanent anchors at various levels and heights within the existing anchor walls. A total of 365 anchors with a combined length of approximately 15,752 meters will be drilled. (In total, the construction program includes 16,556 running meters of stranded permanent anchors with a load-bearing capacity ranging from 1,450 kN to 1,950 kN, as well as the installation of 386 concrete anchor lugs.
Strong Partnership and Cross-Divisional Value Creation
This project underscores the strength of intra-group collaboration: In close cooperation with Swietelsky Betonbau Graz, the manufactured anchors are fitted with cast-in-place concrete beams and professionally prestressed. This extraordinary construction method impressively demonstrates how highly complex, cross-divisional processes are coordinated internally and implemented with maximum efficiency.
Project Profile
· Project: Slope stabilization work along the S6
· Location: S6 Semmering Expressway, between the Maria Schutz and Schottwien interchanges; Lower Austria
· Duration: through 2026
· Responsibility: Austria West │ HTB Wels Branch (Special Civil Engineering Team) │ HTB Mechanical Engineering │ Swietelsky Concrete Construction Graz
· Scope of work: Concrete construction │ Civil engineering │ Mechanical engineering
· Specifications: 365 drilled anchors with a total length of approximately 15,752 m │ 386 concrete anchor pits │ 152 mm drill diameter (cased) │ Working height of up to 75 m above the roadway