WKO Branch in Linz

THE LANDSCAPING OF THE LINZER PARK IN THE CITY CENTER IS CREATING A HIGH-QUALITY OUTDOOR SPACE THAT SUSTAINABLY ENHANCES THE URBAN ENVIRONMENT. WORK ON THE 1,200-SQUARE-METER SITE BEGAN IN SPRING 2024 AND WAS COMPLETED IN FALL 2024 AFTER A TEN-WEEK IMPLEMENTATION PHASE.

261212 WKO Filiale Linz AT (C)SWIETELSKY (3)

Humus Application and Intensive Green Roof Installation

Work began with extensive humus application on the designated planting areas. Directly above the underground parking garage, an intensive green roof system was installed, which included not only the laying of turf but also the integration of a robotic lawn mower.

Landscaping of the Central Plaza and Tree Planting with a Crane

As construction progressed, the focus shifted to landscaping. Boulders and a water lily basin were incorporated to create a more harmonious overall appearance. A logistical highlight of the project took place in the inner courtyard, where a large birch tree was planted with the help of a crane.

Xx WKO Filiale Linz AT (C)SWIETELSKY (3)

Drought-Tolerant Perennials and Modern Irrigation

The project culminated in the greening of the roof with a selection of drought-tolerant perennials, herbs, and grasses. A professionally installed irrigation system ensures the sustainable establishment and long-term maintenance of the entire planting.

Project Profile

· Project: WKO Branch

· Location: Linz, downtown

· Duration: 10 weeks

· Responsibility: Tiefbau Ost │ external landscape planning

· Scope of work: Planting │ intensive green roof │ irrigation system

· Features: 1,200 m² of garden space